Aikin Aikin:
Ni da na dogara ne kawai ga masu samar da kayan masana'antu 18 tare da kudin makamashi na $ 0.44 / Kwh, wanda ake kara fitar da farashin mai da kudaden dabaru / ciyarwa. Grid Power ($ 0.14 / Kwh) wanda aka ba da ƙananan ƙimar amma wadataccen wadata.
Wannan aikin ya tura wani microgrid ɗin da ke tattare da PV, adanawa, Diesel Ajiyawar, Haɗin Solar don amfani da rana / ƙayyadadden yanayi yayin riƙe Diesel azaman madadinsu.
Wuri: Zimbabwe
Scale:
- Lokaci 1: 12mwp Solar Pv + 3MW / 6Mwh Ess
- Lokaci 2: 9MW / 18MWH ESS
Yanayin aikace-aikacen:
Hada Solar Pv + Makamashin kuzari + Diesel Generator (Mallrodrid)
Tsarin tsarin:
12mwp slar pv medules
2 Abun da aka tsara Tsararren Kaya na Kaya (3.096mwh duka iyawar)
Fa'idodi:
- Est. Daily Savingity Savinger Savinger Wellings 80,000 Kwh
- Est. Alajin Cost na shekara-shekara $ 3 miliyan
- Est. Lokacin dawo da kudi <28 watanni
Lokaci: Jun-12-2025