Project Overview
Wenergy achieved a major milestone by successfully delivering the first batch of battery energy storage systems (BESS) for a customized U.S. project. The initial shipment, totaling 3.472 MWh of BESS and supporting equipment, has officially departed from port, marking the beginning of international delivery and on-site execution. This delivery sets a solid foundation for installation, commissioning, and subsequent project phases.

Solution Highlights
The full project includes 6.95 MWh of BESS and a 1500 kW DC converter, forming an integrated “solar + storage + DC charging” solution. The first shipment comprises 3.472 MWh paired with a 750 kW converter, designed to build a clean, renewable-powered EV charging infrastructure in the United States.
This system supports the transition to sustainable transportation and boosts local renewable energy utilization.
Innovative System Design
Wenergy’s solution adopts an advanced DC bus architecture that unifies solar generation, battery storage, and DC fast charging.
Compared with traditional AC-coupled systems, this configuration:
Reduces multiple energy conversion stages
Minimizes system losses
Improves overall efficiency and response speed
The result is higher energy utilization, lower operational costs, and enhanced performance for the end user.
Customer Value & Market Impact
This project demonstrates Wenergy’s strong system integration capability, manufacturing excellence, and reliable global supply chain.
It also reflects growing recognition of Wenergy’s modular, intelligent energy storage solutions in the North American market.
As the project progresses, Wenergy continues to expand its strategic presence in the U.S., supporting the region’s clean energy transition and electrified transportation goals.
Post time: Oct-30-2025




















