Moldova C&I Energy Storage Project

Project Overview

Wenergy continues to expand its presence in Europe with the successful delivery of a battery energy storage project in Moldova. The project is equipped with Wenergy’s Stars Series 258kWh Outdoor All-in-One ESS Cabinets, designed to enhance energy flexibility, reliability, and operational efficiency.

The system adopts a compact all-in-one cabinet design, integrating liquid cooling, smart Energy Management System (EMS), and dual fire protection. With a system efficiency of over 89%, the solution ensures stable performance and optimized energy utilization under demanding operating conditions.

Project Specifications

  • Total Installed Capacity: 4.128MWh

  • System Configuration: 16 × 258kWh Outdoor All-in-One ESS Cabinets

  • Power Switching: Integrated with 1000kW Static Transfer Switch (STS) for seamless and reliable power transition

Key Benefits

  • Peak Shaving & Valley Filling to optimize energy consumption

  • Backup Power for Critical Loads, improving supply reliability

  • Reduced Diesel Dependency, supporting cleaner energy use

  • Enhanced Energy Efficiency and Cost Control through intelligent operation

 

Market Impact

Scalable, grid-ready, and engineered for challenging environments, this project demonstrates how Wenergy’s energy storage solutions support resilient power systems and sustainable energy development across European markets.


Post time: Jan-21-2026
Request Your Customized BESS Proposal
Share your project details and our engineering team will design the optimal energy storage solution tailored to your objectives.
Please enable JavaScript in your browser to complete this form.
contact

Leave Your Message

Please enable JavaScript in your browser to complete this form.