Hengdian Mobile Energy Storage Project

موقع: Hengdian, Zhejiang, China
حجم: 16.7 MW / 34.7 MWh
Application: Mobile battery energy storage for film production

Project Summary:
Wenergy has deployed one of China’s largest mobile battery energy storage system (BESS) projects in Hengdian, the country’s leading film production base. The 34.7 MWh mobile energy storage fleet provides clean, quiet, and reliable power to replace traditional diesel generators used on film sets.

Key Benefits:

  • Sustainable Power: Enables zero-emission and noise-free filming environments, supporting China’s green film production initiative.

  • High Flexibility: Trailer-mounted systems can be rapidly deployed to different film sites as power demands shift.

  • Enhanced Efficiency: Ensures continuous, high-capacity electricity for energy-intensive shooting schedules.

  • Scalable Deployment: The project will total 16.7 MW / 34.7 MWh upon completion, with 70 additional units to support simultaneous productions during peak seasons.

 


Post time: Oct-09-2025
اطلب اقتراح BESS المخصص الخاص بك
شارك تفاصيل مشروعك وسيقوم فريقنا الهندسي بتصميم حل تخزين الطاقة الأمثل المصمم على أهدافك.
يرجى تمكين JavaScript في متصفحك لإكمال هذا النموذج.
اتصال

اترك رسالتك

يرجى تمكين JavaScript في متصفحك لإكمال هذا النموذج.