Hengdian Mobile Energy Storage Project

Project Overview

  • Location: Zhejiang, China
  • Phase I: 2.43MW / 4.761MWh
  • Phase II: 16.7MW / 34.7MWh
  • Application: Mobile battery energy storage for film production

Hengdian Studio, Asia’s largest film shooting base, consumes over 3 million kWh of electricity annually across more than 300 film crews. To replace conventional diesel generators and meet the need for flexible, reliable power, Wenergy deployed a 16.7 MW / 34.7 MWh mobile Battery Energy Storage System (BESS) in Phase II, following the 2.43 MW / 4.761 MWh Phase I deployment. With over 40 Turtle M Series Mobile ESS units in operation, the system provides plug-and-play power for film sets and other temporary applications. A typical 723 kWh unit can charge in around two hours and power a mid-sized crew for a full day.

 

Solution Highlights

  • Mobile & Flexible Power: Plug-and-play ESS units enable rapid deployment across film sets, events, residential areas, and other temporary power scenarios.
  • Cost-Optimized Operation: Charges during off-peak hours and discharges during high-demand periods, reducing electricity costs by up to 60%.
  • High-Efficiency & Smart Management: Achieving over 95% efficiency, the system is connected to Wenergy’s cloud platform for real-time monitoring and intelligent alerts.
  • Cleaner Diesel Alternative: Replaces fuel-based generation with battery power, eliminating on-site fuel storage, generator noise, and local emissions.

 

Customer Value

  • Lower Energy Costs: Reduces operating expenses through off-peak charging and high-efficiency energy delivery.
  • Reliable & Low-Carbon Power: Supports continuous film production with fast, stable power while reducing dependence on diesel generators.
  • Measurable Sustainability Impact: In its first three months, the system delivered over 600,000 kWh and avoided approximately 47 tons of CO₂ emissions, equivalent to nearly 20,000 liters of diesel.

Post time: Oct-09-2025
Request Your Customized BESS Proposal
Share your project details and our engineering team will design the optimal energy storage solution tailored to your objectives.
Please enable JavaScript in your browser to complete this form.
contact

Leave Your Message

Please enable JavaScript in your browser to complete this form.