Project Location: Riga, Latvia
System Configuration: 15 × Stars Series 258kWh ESS Cabinet
Installed Capacity
Energy Capacity: 3.87 MWh
Power Rating: 1.87 MW
Project Overview
Wenergy successfully deployed a modular battery energy storage system in Riga, Latvia, delivering flexible and efficient energy storage capacity for commercial and industrial applications. The project is designed to support load management, operational efficiency improvement, and future scalability.
Benefits
Peak Shaving – Reducing peak demand pressure and electricity costs
Load Balancing – Smoothing load fluctuations and improving energy profiles
Cost Optimization – Enhancing overall energy efficiency and operational economics
Scalable Architecture – Modular design enabling seamless future expansion
Project Value
This project highlights how compact and scalable ESS solutions can effectively support European C&I users in optimizing energy consumption while strengthening interaction with the local power grid. It reflects the growing role of battery energy storage in enabling flexible, resilient, and cost-efficient energy systems across Europe.
Industry Impact
By integrating modular ESS technology, the project demonstrates a practical pathway for businesses to adapt to evolving energy markets, manage rising electricity costs, and support the transition toward a more flexible and sustainable power infrastructure.
Post time: Jan-21-2026




















